| Year | Location | |
| Kikeh FPSO Deugro | 2007 | Pasir
Gudang | Barging 10 units of suction anchor (mooring equipment)
from MMHE Pasir Gudang to Labuan | |
| Tuanku Jaafar Power Station Port Dickson Rehabilition Phase 2
Project | 2007 | Port
Dickson | Barging and inland transportation of Toshiba
power plant equipment of up to 350 tons. | |
| IT Portlink | 2006 | Pasir
Gudang | Roll-off and barging of RTG ex Pasir Gudang Port
to Tanjong Periok Jakarta | |
| Aker Kvaerner Kikeh South Project Labuan | 2006 | Westports | Inland
transportation and barging of suction anchor and production manifold from Westports
to Labuan | |
| Deugro Project | 2006 | Port
Klang- Pasir Gudang | Inland transportation, roll-off
and barging of Solphate Removal Package Skid:274 tons. From Kvaerner fabrication
yard, Port Klang, to SDE yard, Pasir Gudang. | |
| Rabigh Development Project KNM | 2006 | Kuantan | Transportation
of 7 units heavylift cargoes (100 to 430 tons) from KNM yard, Gebang, to FAS,
Kuantan Port. | |
| KNM Ogpet (East Coast) S/B (Fertilizer Complex,
Al-Jubail Project) | 2005 | Kuantan | Transportation
of 2 super heavylift cargo (390 tons and 550 tons with dimension of 48m x 8.5m
x 10m) from KNM yard, Gebeng, to FAS Kuantan Port. | |
| KNM-SAFCO for Unde | 2005 | Gebeng | Inland
transportation of 10m high, 8m wide, 40m long, 504MT and 39MT pressure vessels. |
|
| Dolphin Project KNM | 2005 | Melaka | Inland
transportation, roll-off and barging from Melaka to Port Klang alongside mother
vessel for shipment. | |
| Transglobal Pte Ltd | 2005 | Lumut | Inland
transportation, roll-off and barging for 6 units membrane skids from HLE fabrication
yard to SSE Pasir Gudang. | |
| Global Process System | 2005 | Kuantan | Inland
transportation and barging for HP Frame Ko Drum and ES-Glyed Regeneration pack
from AMB, Kuantan, to MMHE yard Pasir Gudang. | |
| KNM-DP-Fabricataors (Sohar Refinery, Owan Project) | 2004
- 05 | Melaka | Inland
transportation and barging to Port Klang alongside mother vessel for shipment. |
|
| Kvaerner Process System | 2004 | Port
Klang | Inland transportation and heavylift assembly works
of 270MT oil rig equipment. | |
| KNM-DP-Fabricators (Brook Dockyard) | 2004 | Melaka | Delivery
of 80-ton pressure vessel ex KNM fabrication yard to HL Engineering, Lumut. |
|
| KNM DP-Fabricators (SOME Sembawang Yard) | 2004 | Melaka | Inland
transportation to Melaka jetty, ro-ro onto barge and deliver alongside Sembawang
Yard. | |
| MELCO-PD Project | 2004 | Port
Dickson | Barging Port Klang-Port Dickson-Port Klang:
exchange of damaged to new stator generator. | |
| KNM-Guntong Project | 2004 | Gebeng | Heavy
and over-sized pressure vessels: inland transportation, roll-off at Kuantan Port
and barging to SSE. | |
| KNM Ogpet (East Coast) S/B (Gutong E Project) | 2004 | (Gutong
E Project) | Transportation of 15 vessels from Gebeng
fabrication shop by road and over-sized cargo by barge to SSE yard, Pasir Gudang. |
| | | | | |
|